PulseWorx Plan
Beta
File
Edit
View
Draw
Run
System
Validate
Output
Untitled Project
Saved
Layers
Drawings
Import a DXF drawing
Lighting Runs
Use the
R
tool to draw lighting runs
Groups
Select multiple runs in the Inspector, then click
Group selection…
100%
10 mm
25 mm
50 mm
100 mm
200 mm
500 mm
1 m
2 m
5 m
PulseWorx Plan
Professional lighting infrastructure engineering
Quick start
Press R
Draw a lighting run
Import DXF
File → Import Drawing…
Assign strategy
Select run → Inspector
Ready
100%
SNAP
SELECT
Validation
BOM
Patch
Cables
Schematic
Log
No validation issues — system is valid
Inspector
Nothing selected
Select a lighting run or drawing to inspect and configure it
Project Details
Name
Project #
Client
Designer
Date
Address
Description
System Summary
Runs
0
Total length
0.0
m
Total load
—
Drawings
0
Components
0
BOM items
0
Validation
Issues
None ✓